Create operation

File access

Production store access


How to find Operations?
gele

 

To find Operations, you should:

    1. Go to Resources:

        1.1. Press  Resources;

        1.2. Press Resources;

Now you can see Workplaces, Workgroup, Operations and Subcontractors List:


Add (+) How to create new Operation?

If you would like to create new Operation, you could press Operations (+) and create it.


New operation dialog

1. To create new Operation you need to press Operations (+):

2. In dialog table enter name

3. Press Create

Now you can see Operation Options


Operations Options


ButtonWhat does it indicate?
Quality control (on)Quality controlYou could claim Quality control
SuperviserSuperviser: Quality director
You could choose Superviser
File access (on)File accessYou could access files in Operation Event
Production store accessYou could access production store (barcode in Operation Event --> Products)
Show order (on)Show orderYou could let operator to see Order information
Show order files (on)Show order filesYou could let operator to see Order files
Show products (on)Show productsYou could let operator to see Order products (Operation Events --> Products)
SegmentedYou could switch on Segmentation (only if Article Production is segmented and you add it)
Link Layer eventsYou could choose Operations which are in Article Production (segmented)

Segment link minSegment link min: 600

You could set minimum time (seconds) between two Operations
Segment link max Segment link max: 800
You could set maximum time (seconds) between two Operations
Standard time: 0 d 00 h 20 m 00 sStandard timeYou could set standard Operation time
Exclude from productionYou could choose is it Production Operation or not
Manager confirm
You could choose when create order operation (when order is created or when it is confirmed by manager)
Auto status updateYou could update Operation status automatically
Auto resource assignmentYou could assign resources automatically (Switch (on)) or assign workplace manual in Production (Switch (off))
Can start before previous finishesYou could start Operation before previous finishes
Requires employeesYou could require to assign employee to operation
Uses material recipeYou could use material recipe in Operation
ParallelityYou could let this Operation start for many employees
One finish allYou could let operator to finish all suboperations


Operations Resources


Here you can see, add (Add (+)) and delete (Remove (red ✕)) Workgroups and Subcontactors


Operations Parameters Visible to Opertor


Here you can see, add (Add (+)) and delete (Remove (red ✕)) Parameters, which will be visible to Operators in Operation event and Calendar (it depends on Parameter fields)


Operations Relations


Here you can see, add (Add (+)) and delete (Remove (red ✕)) Relations with other Operations


Operations Articles



Here you can see Articles, which use this Operation


Operations Materials


Here you can see, add (Add (+)) and delete (Remove (red ✕)) Materials categories